2x600MW锅炉主要施工组织设计方案

发布者: 发布时间:2012/10/13 8:55:00 阅读:1320
聚划算

  工程简介

  本期建设规模2×600MW燃煤发电机组。锅炉由SEC提供。锅炉为亚临界参数、强制循环、一次中间再热、单炉膛平衡通风、固态排渣、露天布置、全钢构架的∏型汽包炉。

  This project is 2×600MW coal fired thermal units, boiler shall be supplied by SEC. The boiler is all steel structural ∏ type drum boiler of a subcritical parameter, pump circulation, single reheat, single furnace balance draft, dry slagging and hypaethral placement.

  锅炉施工方案

   Boiler Erection Plan

  锅炉为上海××××集团生产的亚临界参数、强制循环、一次中间再热、单炉膛平衡通风、固态排渣、露天布置、全钢构架的∏型汽包炉。

  The Boiler shall be supplied by SEC. The boiler is all steel structural ∏ type drum boiler of a subcritical parameter, pump circulation, single reheat, single furnace balance draft, dry slagging and hypaethral placement.

  施工场地及主吊机械

  Erection site and main hoisting equipments

  施工场地布置 

  Erection site plot

  锅炉组合场布置按总平面布置图,组合场内布置50t龙门吊各4台,锅炉受热面的大部分组合工作安排在此完成。

  Boiler assembly yard will be arranged as per general layout drawing.  Four 50T gantry cranes will be provided respectively. Assembly of most heating surface structures will be done in this area.

……

  详情请下载附件2x600MW锅炉主要施工组织设计方案

责任编辑:玛门

关于易利-项目管理-产品中心-联系我们-帮助中心-申请链接